Friday, November 30, 2007

Following the pattern

I'm going to be busy today so I thought I'd get my posting done early. It helps that I also have a project finished early this morning.
uzume finished
Pattern: Uzume
Yarn: Trekking XXL
Needles: 2.25 mm DPNS
Notes: I changed the heel to a short row heel to accommodate the dark yarn. Otherwise I tried to stick to the pattern.

I say that I tried to stick to the pattern because as Io was tucking in my ends I realized that the ribbing on the first sock is 2x1 but the ribbing on the second sock is 2x2. Whoops. You can hardly tell from the right side, which is why I made the mistake, so I don't think I will redo the ribbing. I may give the recipient the option of having me redo the ribbing. If I do redo the ribbing I will do more rows of it because I find these socks don't stay up as well as they might.

I have learned my lesson, though. When it comes time to start a second sock it is worth checking with the pattern instead of quickly eye balling the finished sock. Live and learn.

Thursday, November 29, 2007

Toeing the (finish) line

uzume toe

I am a few rows away from a finished pair of socks. The uzume socks should be finished easily tomorrow which means I will have a choice between casting on the second mitten and casting on a hat. Or I could cast on a new pair of socks. Choices, choices. All this early Christmas knitting is going well. Everything should be done by when I need it.

Wednesday, November 28, 2007

Half done

13 back done
13 palm done

I finished the mitten today and I'm no longer worried that it will be way too big. It is a wide mitten but it fits me so it should fit the person I knit it for. It needs a good block and the ends tucked in but it is otherwise finished. Now I just need to knit another one before Tuesday.

I've also been knitting away at the dark sock. I've reached the end of the leg so I can start the heel tomorrow. This means I'm a bit more than half done.

I think my knitting deadlines will be met. There are a couple more projects still to cast on but they are small and can be travel knitting if I don't get to them earlier.

Tuesday, November 27, 2007

Mitten knittin'

13 back
13 palm

Today I mostly knit away at this mitten. I keep reminding myself that mittens should have some positive ease because this mitten looks huge to me. Part of why it looks so big is that it has a patterned cuff that looks like part of the hand so it looks longer than it is. I think it will fit the person I'm giving it to but it might be a roomy fit.

Once the 1x1 ribbing is done this is a remarkably quick knit. I should be able to easily finish this one and start on its mate tomorrow unless I get tired of them and go back to my sock or start the hat I still have to knit. Tune in tomorrow to see what happens!

Monday, November 26, 2007

Double duty swatch


Today I found myself progressing really slowly on my second Uzume sock so I decided to take a break and start on the mitten. This is the same brown and white mitten that I started a while ago but didn't swatch for. This time I swatched using 2.5 mm needles. It turned out well since I got both a fabric I like and the pattern's required gauge. Nice.

I actually knit a small steek into my swatch because I've promised to show my mother how steeking works when I'm home. Since I'm thinking of knitting some sort of colour work sweater with this Romney wool this swatch is also a chance to see how it holds up to being cut. I think it will be a lot like the Shetland jumper wool but we will see. Hurray for test swatches.

Sunday, November 25, 2007

One down

uzume 1
I'm so glad I picked up this Uzume sock again. I had been frustrated trying to pick up stitches neatly along the flap of the heel because the yarn is so dark. I decided not to keep trying to do something that wasn't working and instead I opted for a nice short row heel. I got the new heel from my favorite Waterfall sock pattern and added in a bit of eye of partridge for good wear. I've already cast on for the second sock of this pair so I should have a finished object in a few days. Hurray for gifts that are ready to be given.

I've mentioned it before (I think) that I love these really dark Trekking colours. They are darker in real life than in the pictures and they almost look iridescent. A Peacock Feather Shawl would look wonderful in this yarn I imagine.

Right now I'm waiting for my Blue Moon Fiber yarn to arrive so that I can start of my Irtfa'a shawl. Yesterday I got an email from the postal service saying that they are getting ready to ship it. With any luck at all it will arrive before I leave for my very early Christmas trip home. Cross your fingers.

Saturday, November 24, 2007

Finished and resumed

grey and red
The grey and red project is all finished. I am really glad that most of the people I'm knitting for have hand and foot sizes similar to my own. The only downside of being able to try things on to test for fit is that I know I could easily keep the finished product for myself.

Pattern: To be announced, though I'm sure some of you can guess.
Yarn: Louet Gems super fine merino. One skein in Cloud Grey and one in Burgundy with left overs of both colours.
Needles: 2.5 mm and 3 mm addi DPNs

This means that I have a week and a bit to knit a pair of socks (maybe two), a hat and a pair of mittens. I actually think this is doable. It helps that I am part way through the first pair of socks.

If you recall back at the beginning of November (about the 7th) I cast on for a pair of socks in a lovely dark Trekking yarn. I set them aside because I wasn't thrilled with how the heel was coming out and I had other things to knit. I have decided to put in a short row heel instead of the flap heel the pattern suggests. We'll see how this goes.

One last thing because I can't keep wordplay to myself. When I discovered last night that I had posted to the wrong blog on Friday I was in a hurry to correct my mistake. I realized after that I really should have referred to this mistake as my "NaBloPoMo D'oh". That is all.